Describe the building and what you have seenWaldo, AR 71770
Call (855) 974-4733
Describe the building and what you have seenCall any time(855) 974-4733
Guide

The Written Contract Arkansas Requires for Termite Work

Arkansas Code 17-37-221 requires a written termite contract with the property owner, guaranteeing the work for at least one year. What that means near Waldo.

Illustration for the guide "The Written Contract Arkansas Requires for Termite Work" (Waldo, AR)
Short answer

Arkansas law requires a licensed operator employed to control termites or other structural pests to enter a written contract with the property owner, and that contract must guarantee the performance of the work for at least one year and meet the Arkansas State Plant Board's minimum standards. The paper is not optional.

Key takeaways

  • Arkansas Code 17-37-221 requires a written contract with the property owner for termite or other structural pest control work.
  • That contract must guarantee the performance of the work for at least one year and meet the Plant Board's minimum standards.
  • Operators file a monthly report with the Arkansas State Plant Board on termite and structural pest work and send copies of contracts.
  • A 2021 amendment, HB 1199, revised the statute's contract and records provisions.
  • The one-year term is an Arkansas provision and does not travel to Webster Parish, Louisiana, where a different rule governs the contract.
  • What the Board's minimum standards contain, and any renewal term or fee, is not stated on this page.

What does Arkansas Code 17-37-221 actually require?

That the work be put in writing. A licensed operator employed to control termites or other structural pests must enter into a written contract with the property owner, and the contract must guarantee the performance of the work for at least one year and meet the Plant Board's minimum standards.

Three separate obligations sit in that sentence and it is worth taking them apart. First, there must be a contract, and it must be written. Second, the other party to it is the property owner, not a tenant, a relative or a contractor standing in. Third, the contract carries a guarantee of the performance of the work with a floor of one year, which means a shorter term is not a cheaper option but a defective contract.

The fourth element is the one this page will not expand on. The contract must also meet minimum standards set by the Arkansas State Plant Board, and what those standards require is not something to characterize from a distance. A homeowner who wants to know whether a particular document meets them has one reliable route, which is to ask the Board that writes them, through the Arkansas Department of Agriculture.

Who writes and enforces this, and under what law?

The Arkansas State Plant Board, part of the Arkansas Department of Agriculture, licenses pest control under the Arkansas Pest Control Law, with the rules compiled as Circular 6. The contract requirement itself sits in the statute rather than in the rules.

The Plant Board is the body a structural pest operator in Arkansas answers to. It issues the licenses, and it also regulates pesticides in the state. The Pest Control Law divides the trade into classifications, and the one that matters here is Classification 1, which covers termite and other structural pests. Classification 2 covers household pest and rodent control. A company doing termite work is working under the first of those.

There is a second layer that a homeowner rarely sees but that shapes the paperwork. Operators file a monthly report with the Board on their termite and structural pest work and send copies of contracts to it. So the document signed at a kitchen table is not the only copy in existence, and the reporting cycle is part of why these contracts look standardized. A 2021 amendment, HB 1199, revised the contract and records provisions of the statute.

What does a one-year guarantee of performance mean in practice?

It means the operator's obligation to the work does not end when the truck leaves. The statute sets one year as the minimum term of that guarantee. It does not describe a schedule of callbacks, and this page does not invent one.

The honest way to read the provision is as a floor under the market rather than a description of a service. A term longer than a year is permitted and common in the trade; a term shorter than a year is not. For the reader, that converts a vague question, is this company going to stand behind the work, into a concrete one: what does the signed contract say the guarantee period is, and when does it start.

What the statute does not do is tell a homeowner what happens inside that year, because the detail belongs to the contract and to the Board's minimum standards. So the useful move is not to argue about the law but to read the document. The term, the structure it covers and the work described in it are all on the page in front of you, and anything a technician could not reach should be there too.

Which structure and which work does the contract cover?

Whatever the document names, which is why the description matters as much as the price. A detached garage, a shop, a mobile home on piers or an addition built later are separate structures unless the contract says otherwise.

Small-town properties in southwest Arkansas often carry more than one building, and a contract written for the house does not automatically reach the shed. The same goes for parts of a single building: a slab-on-grade addition tied onto a pier-and-beam original is two kinds of construction with one roof over them, and a perimeter treatment at the original foundation does not necessarily extend to the newer concrete.

This is the point at which reading the contract saves an argument later. Check that the structures are listed, that the method is named, and that the areas a technician could not inspect or treat are recorded as such. The subterranean termite treatment and termite baiting and monitoring pages describe what each of those methods physically involves, which is useful before signing for either.

Does this cover a monitoring or bait agreement too?

The statute speaks to the control of termites and other structural pests, and a bait and monitoring arrangement is control work. The contract obligation and the guarantee floor attach to it as they do to a liquid treatment.

The practical difference is in what the document is describing. A liquid soil treatment is a finished piece of physical work with a treated perimeter to point at. A bait and monitoring arrangement is an installation plus a standing commitment to return and inspect, so the contract has to describe a cycle rather than an event. Both are structural pest control and both belong in writing.

A homeowner comparing the two should look for the same three things in each document: what is installed or treated, what the operator commits to do afterward, and for how long. If a monitoring arrangement names no inspection pattern at all, that is a question to ask before signing rather than after. Across the state line, Louisiana makes that explicit in rule, which the next section covers.

Does the one-year term apply near Springhill or Shongaloo?

No. Those two areas are in Webster Parish, Louisiana, regulated by the Louisiana Department of Agriculture and Forestry and its Structural Pest Control Commission. Arkansas's statute, and its one-year guarantee, stop at the state line.

Louisiana has its own written-contract rule. Under La. Admin. Code 7 §XXV-119, termite control work must be performed under a written contract with the property owner or the owner's agent, covering one unit or property, and a monitoring-station contract needs an addendum listing the number of stations and the inspection frequency. Licensees report termite contracts, wood-destroying insect reports and perimeter applications monthly, and a December 2023 final rule amended several sections including that one.

What this page does not do is read Arkansas's one-year term into that rule, because it is not there. The two states impose contracts for the same reason and not on the same terms, and carrying a term across the line would mislead the reader on whichever side of it they live. The two-state rules guide sets the two regimes side by side without mixing them.

What about a contract for a house sale?

A treatment contract and an inspection for a sale are different documents. Whether a sale needs an inspection in Arkansas is a question for the lender and the closing agent, since it is the loan conditions or the purchase contract that ask for it.

No public-body requirement for a wood-destroying insect report on an Arkansas residential sale is on record here, so this page points the reader at the people who actually set the condition. Ask the lender what it requires and ask the closing agent what the purchase contract says. If an inspection is called for, its scope follows from whoever asked, and the document it produces is a finding rather than a guarantee.

Confusing the two causes real trouble at a closing. A guarantee attaches to work that was performed; a report describes what was observed on a date. A buyer who wants both needs both, and a seller who has a current treatment contract should have the document itself rather than a memory of one. In Louisiana the wood destroying insect report has its own rule, §XXV-121.

What should you read before signing?

The structures named, the method, the guarantee term and its start date, and the record of anything not reached. Those four items are where disputes begin, and all four are on the page in front of you.

Go through it in that order and ask about each one out loud. Which buildings are covered. What is being done, in plain words: trenching and rodding a perimeter, drilling a slab, installing and servicing stations. How long the guarantee of performance runs and from when. And what the technician could not get to, which on a packed crawl space or behind a built-up flower bed can be a substantial part of a foundation.

Then keep the paper. It is the only document that names the work on your own building, and the operator's copies go to the Plant Board on a monthly cycle rather than to you. Nothing on this page is a quote and no arrival time is promised: you describe the problem, and the company sets the visit once it has the details. Termite contracts and guarantees covers the same ground from the service side.

Frequently asked questions

Is a written contract genuinely required for termite work in Arkansas?

Yes. Arkansas Code 17-37-221 requires a licensed operator employed to control termites or other structural pests to enter into a written contract with the property owner. The contract must guarantee the performance of the work for at least one year and meet the Arkansas State Plant Board's minimum standards. A verbal arrangement for termite work does not satisfy that.

Can a company offer me a guarantee shorter than a year?

Not under the statute. One year is the minimum term the law puts on the guarantee of performance, so a shorter period is not a budget option but a contract that falls below the floor. Longer terms are permitted. The document itself should state the period and when it begins, and that is the line to read before signing.

Who keeps a copy of the contract besides me?

The operator sends copies to the Arkansas State Plant Board. Licensed operators file a monthly report with the Board on their termite and structural pest work and send contract copies with it. That reporting cycle was among the provisions revised by a 2021 amendment, HB 1199. You should still keep your own copy, since it is the document that names the work on your building.

What are the Board's minimum standards?

The statute requires the contract to meet minimum standards set by the Arkansas State Plant Board, and this page does not state what those standards contain. A homeowner who needs to know whether a specific document satisfies them should ask the Board itself, through the Arkansas Department of Agriculture, rather than rely on a description written at a distance.

Does my contract near Shongaloo have to guarantee a year?

Shongaloo is in Webster Parish, Louisiana, so Arkansas's statute does not govern it. Louisiana requires termite work to be under a written contract with the property owner or the owner's agent under La. Admin. Code 7 §XXV-119, and a monitoring-station contract there needs an addendum listing stations and inspection frequency. No one-year term is stated here for Louisiana.

Does the contract tell me whether the company is bonded?

Bonding is a licensing matter rather than a contract term. Classifications 1, 2 and 3 require a surety bond and insurance on file with the Arkansas State Plant Board before a license issues, so a licensed Classification 1 operator has met that condition. The amount is not printed here. The license guide covers how the credential works.

Sources

  1. Arkansas Department of Agriculture
  2. Louisiana Department of Agriculture and Forestry

This guide is general information for Columbia County homeowners, not a substitute for an on-site inspection. Prices are estimates. See our disclaimer.

Need help today?

Call any hour and explain what is going on. You get a clear price before any work starts.

Keep reading

More guides

WhatsApp